The importance of an authority approval matrix
Why every development needs a single, living record of the approvals it requires, who owns each one, and what each depends on.
Most delays in a development’s early stages are not caused by a single difficult approval. They come from approvals that nobody owned, submissions that waited on a document nobody requested, and comments that sat unanswered in an inbox. An authority approval matrix exists to prevent exactly that.
What an approval matrix is
An approval matrix is a single register of every approval, permit and no-objection certificate the project needs, from concept through to completion. For each item it records:
- The authority issuing it, and the relevant contact or portal.
- The owner on the project team responsible for the submission.
- Dependencies: the drawings, reports or other approvals that must exist first.
- Status and dates: submitted, under review, commented, resubmitted, approved.
- Conditions attached to the approval that must be carried forward.
Why it matters
It reveals the critical path. Approvals rarely run in isolation. When dependencies are mapped, it becomes clear which items will hold up everything behind them, and those receive attention first.
It creates accountability. A named owner for every line removes the assumption that someone else is following up.
It protects the programme. Comments and resubmissions are tracked against dates, so slippage is visible early, while it can still be recovered.
It informs decisions. Management sees, at a glance, what is approved, what is outstanding and what requires their intervention.
Keeping it alive
A matrix prepared at the start and never updated quickly becomes misleading. It should be reviewed in every project meeting, updated as correspondence arrives, and linked to the project’s document register so that each approval can be traced back to what was submitted.
How A20 helps
We prepare the approval matrix at project setup, coordinate consultant submissions against it, follow up with authorities and master developers, and report on its status as part of regular management reporting. Discuss your project with our team.